JIER MARINE has successfully delivered a specialized marine bollard solution for Dalian Hengli Heavy Industry Shipyard, enhancing the facility's mooring capabilities for large vessel operations.
The project included the supply of high-performance T-bollards (550 kN working load) and double-head bollards (250 kN per head). Constructed from ASTM A36 structural steel with minimum 250 MPa yield strength, these units feature precision-engineered designs to withstand harsh marine conditions in Dalian Bay.
A key feature of this project is the environmentally friendly, high-performance external coating system:
Eco-Friendly Epoxy Topcoat: Our proprietary two-component epoxy coating contains low-VOC formulations meeting international environmental standards while providing superior corrosion resistance.
Multi-Layer Protection: Following abrasive blast cleaning to SA 2.5 standard, each bollard received hot-dip galvanization (80μm minimum) combined with the advanced epoxy topcoat.
C5-M Certification: The complete coating system meets ISO 12944 C5-M requirements for extreme marine environments, ensuring 15+ years of service life with minimal maintenance.
Enhanced Durability: The specialized formulation resists salt spray, UV degradation, and mechanical abrasion while maintaining environmental compliance.
All units underwent rigorous production controls:
- Material traceability with full test certification
- Precision fabrication within ±2mm tolerance
- 100% ultrasonic testing of critical weld joints
- Comprehensive dimensional verification
- Full-scale load testing to 125% of working load
Each bollard was carefully packaged and shipped with complete documentation including material certificates, test reports, and installation guidelines in both English and Chinese. Our technical team provided on-site support during unloading to ensure proper handling.
This project demonstrates JIER MARINE's commitment to delivering environmentally responsible, high-performance marine infrastructure solutions that meet the demanding requirements of modern shipbuilding facilities. The advanced corrosion protection system ensures long-term reliability while minimizing environmental impact throughout the product lifecycle.
JIER MARINE Completes Bollard Project for Dalian Hengli Heavy Industry
JIER Marine Super Cell Fenders for Tanker Berth in Italy (JSC)
JIER Marine Cylindrical Fenders are ready for installation (JCY)
JIER Marine Pneumatic Fender Installed on Oil Tanker in Norway (JCQ)
JIER Marine Super Cone Fenders--Ready to go to Bangladesh (JSC)
JIER Marine JCO2500H-The largest Super Cone Fender in the world (JCO)
Warmly Welcome Kenya Ports Authority and Contractor Team(JCY、JPF)
We installed fenders and bollards for Rizhao Port(JSC、t-bollard)
Home | Products | About | Capabilities | Projects | Support | Resource | News | Contact | Privacy Policy